Structural Health Monitoring of Mine Shafts

Wireless logger in mine shaft

Structural Health Monitoring of Mine Shafts The Project Site GEO-Instruments Canada provided instrumentation and monitoring during development of a potash mine in Saskatchewan. The potash deposits were 900 meters underground, so the mine had to construct access shafts. Instrumentation was required during construction of the shafts and also for large-scale testing of the concrete mixes…

Read More

Wide-Area Wireless Data Logging for Tailings Dam

Wireless Logger Installation

Wide-Area Wireless Data Logging for TSF Requirements for the loggers included long-range radio communication and efficient battery-powered operation. The loggers had to deliver measurements at temperatures well below zero for much of the year. Challenge GEO-Instruments Canada was tasked with installing a monitoring system at a tailings dam attached to a major iron ore mining…

Read More

Bridge Monitoring with GNSS

Apollo Planview - Bridge with GNSS Sensors

Bridge Monitoring with GNSS Locator One GNSS sensors can be installed quickly and are fully autonomous: no cables, no power supplies, no gateways, no protective housings, and no maintenance. Locator One GNSS sensors use signals from GNSS satellites to monitor displacements in 3D with an averaged precision of ±2mm horizontal and ±4 mm vertical. Locator…

Read More

Monitoring Soil Consolidation with Locator One

Locator One on Site

Monitoring Settlement with Locator One The Project An industrial structure will be sited on land that was previously used for farming. The soft ground is undergoing consolidation with wickdrains and a surcharge to improve its bearing strength and stability. Monitoring Requirements The progress of consolidation will be monitored using settlement plates. Specifications require weekly surveys…

Read More

Monitoring Water Quality

Buoy with multparameter sonde and ews datalogger

Monitoring Water Quality The Project GEO is monitoring a construction project adjacent to a waterway. The project required water quality monitoring as well as the standard geotechnical monitoring. Monitoring Requirements The water quality parameters included pressure, water temperature, dissolved oxygen, pH, conductivity, and turbidity. Measurements were to be obtained at 1 to 6 hour intervals.…

Read More

I-375 Settlement Monitoring

Twin AMTS Monitoring Bridge

Monitoring I-375 for Settlement I-375 was closed for two nights to allow installation of the instruments. Four AMTS units provided continuous monitoring for settlement of the road surface and bridge during installation of an underground power transmission line. Project The project involved horizontal directional drilling below I-375 to place an underground power transmission line. The…

Read More

Gross Reservoir Expansion

AMTS with GeoCloud Box

Projects ProjectsRecentSettlementExcavationsStructuresWalls & SlopesInfrastructureBridgesTunnelsRailMinesVibrationConsolidationPiles Gross Reservoir Expansion The Project Denver Water’s Gross Reservoir Expansion Project will add 131 feet to the height of the dam, triple the volume of the reservoir, and convert the original concrete gravity structure to a concrete arch structure that can support the expanded capacity. See the video below for more…

Read More

Texas Capitol Complex

AMTS Texas Capitol Complex phase 2

Projects ProjectsRecentSettlementExcavationsStructuresWalls & SlopesInfrastructureBridgesTunnelsRailMinesVibrationConsolidationPiles Texas Capitol Complex Expansion Capitol Complex Phase 1 Phase 1 included construction of  two state office buildings and a five-level underground parking garage topped with a landscaped pedestrian mall. Phase 1 required an extensive support of excavation program. The excavation footprint exceeded 10 acres with an average depth of 60 feet…

Read More

Spokane River Bridge

Programming AMTS to monitor piers and abutments

Spokane River Bridge The BNSF Spokane River Bridge project involves construction of a new rail bridge adjacent to the existing bridge. Geo-Instruments is monitoring the existing bridge for potential impacts from the construction, which includes vibratory pile driving for a temporary pile-supported work trestle. GEO deployed three automated monitoring systems that separately report displacements, vibration,…

Read More

Track Monitoring – Chicago

AMTS Track Monitoring

Automated Track Monitoring – Chicago This AMTS system was used to monitor for potential settlement and lateral movement of twin rails during jack boring operations beneath the rail embankment. The project duration was 10 months. The AMTS was mounted on a tower for good sight lines to rail-clip prisms installed on the tracks. The height…

Read More