TIP Installation

Thermal integrity profiling can identify necking, bulging, cage eccentricities, pile shape, and variations in concrete cover. Above: TIP cables before installation.

GEO technician completing the installation of TIP cables and sister bar strain gauges on a two-part, 40 foot cage that will be tested with a bi-directional load cell from LTC.

The first part of the cage is lowered into the shaft. GEO supplies, installs, and commissions….and gets it right the first time.