TIP Installation

TIP cables

Thermal integrity profiling can identify necking, bulging, cage eccentricities, pile shape, and variations in concrete cover. Above: TIP cables before installation.

TIP Thermal Integrity Profile

GEO technician completing the installation of TIP cables and sister bar strain gauges on a two-part, 40 foot cage that will be tested with a bi-directional load cell from LTC.

TIP Lowering the cage

The first part of the cage is lowered into the shaft. GEO supplies, installs, and commissions….and gets it right the first time.