
We recommend setting up the SVM in your shop so you can learn how it works and test it. To open the SVM, pull out the cotterpin at each corner.

Lift the solar panel and enclosure out of their folded positions, and then fit the solar panel crossbar into the slots on the enclosure bracket.



The next steps show how to connect the fuse, connect the geophone, switch on power, and switch on the monitor.





YouTube Video
We’ve also illustrated these steps in a YouTube video. Click the link below:
Next Steps
- Call GEO to set up a bump test. The bump test generates a waveform to check that communications between the vibration monitor and the GEO server are working properly. Instructions coming soon.
- When you are ready to deploy the system, bury, bolt, or sandbag the geophone and then position the SVM above it. Reconnect the geophone if necessary. Instructions coming soon.